Credits

Client:
Ministry Of Education

Location:
Rangiora

Project Status:
Completed 2020

RANGIORA BOROUGH SCHOOL LIBRARY // EDUCATION

Currently under construction, the library is designed for maximum flexibility to encourage both collaboration and independent learning. With breakout spaces to one end of the library this allows the flexibility of the schools ever changing requirements. The library opens onto a large covered veranda which leads out to the existing grounds. The mono pitch structure allows the building to blend in with the surrounding school buildings onsite.

Credits

Client:
Ministry Of Education

Location:
Rangiora

Project Status:
Completed 2020

Subscribe and become
a Chilton + Mayne Architecture Insider

We will keep you up to date with all things Architecture and what we are getting up to in the studio.

* indicates required